Cost
$1.1b
$1,100,000,000
Description
Construction of a 3.4 km twin-tube road tunnel beneath the Karnaphuli River, together with 4.89 km of approach roads and 740 m of bridges, linking Patenga with Anwara and improving access between Chattogram Port and the industrial area south of the river.