Rampura–Amulia–Demra (RAD) Expressway Project

intraUrban

Distance

12.5 km
new
12.5km
rehabilitated
– km
existing
– km

Cost

$261m
$261,000,000

underConstruction

2028

Description

Construction of a 12.5 km four-lane access-controlled expressway, including an 8.15 km elevated section and a 4.35 km at-grade section, upgrading the existing Rampura–Amulia–Demra corridor between National Highways N1 and N2.

Finance

logo
$65m loan
Bank of China
Bank
logo
$65m loan
Asian Infrastructure Investment Bank
Development bank
Menu